Home Conference Information Track 1 / Session 1: Floating Production Systems 1
11:30 – 13:00: SESSION 1 - FLOATING PRODUCTION SYSTEMS 1
Chair – Mr. Michael W. J. Wyllie, SBM Offshore,
Co-chair –Mr. Bob Kipp, INTECSEA
11:30 – 12:00: Petrobras Cascade Chinook - Installation of First FPSO in the Gulf of Mexico;
Mr. Marco van Vugt, HMC US Inc.
Mr. Marco van Vugt, HMC US Inc.
12:00 – 12.30: Shell Perdido - Installation of the World's Deepest Spar;
Mr. Rene de Koeijer, Heerema Marine Contractors
Mr. Rene de Koeijer, Heerema Marine Contractors
12:30 – 13:00: Thunder Hawk Deep Draft Semisubmersible Floating Production Unit;
Dr. Steve Leverette, SBM Atlantia
Dr. Steve Leverette, SBM Atlantia
Alternate: The Dynamically Positioned Floating Production Drilling Storage and Offloading (DP-FPDSO) Unit in the Pre-Salt Fields of Brazil;
Mr. Leen Poldervaart, Single Buoy Moorings



